Skip to content
Back
Commodity

Kamitente 2 Gold Project

StatusImmediate Shipment

Kamitente Gold provides tokenised access to a defined 150-kilogram gold allocation from the Kamitente 2 Gold Project in Haut-Katanga, Democratic Republic of the Congo. The project is an existing gold-producing operation currently producing approximately 6–8 kg per month, with an industrialisation programme targeting 200–300 kg per month through expanded mining, processing and site infrastructure. Each Kamitente Gold Token represents 1 kilogram of gold, with a total offering of 150 tokens at USD 100,000 per kilogram. The offering is structured as a single 90-day round, with physical delivery targeted at approximately 60 days and an indicative Dubai delivery timeline of approximately 40 days, subject to production, verification, export and logistics requirements. The offering also incorporates 105% Credit Trade Risk Insurance for 90 days for covered buyer exposure, placed through Lockton KSA and reinsured by Swiss Re, Munich Re, Hannover Re, Allianz Afrique, Tokyo Marine, Coface France and ATI, subject to the applicable policy terms and conditions. The project combines an established mining operation with industrial expansion and Cireta's tokenisation infrastructure, creating a digitally tracked pathway from physical gold production to tokenised allocation and physical delivery.

Gold, Reimagined

Kamitente Gold brings physical gold into a new digital ownership framework through the tokenisation of a defined 150kg allocation from the Kamitente 2 Gold Project in the Democratic Republic of the Congo. Each Kamitente Gold token represents 1kg of the allocated gold and is offered at a fixed price of $100,000 per kilogram through a single 90-day offering. The underlying project is an existing gold-producing operation, currently producing approximately 6–8kg per month, with an industrialisation programme targeting 200–300kg per month through expanded mining, processing and site infrastructure. Cireta provides the digital infrastructure connecting the physical gold allocation with its tokenised representation, creating a transparent pathway from production and verification to allocation and physical delivery. Eligible covered buyer exposure is supported by 105% Credit Trade Risk Insurance for 90 days, placed through Lockton KSA and reinsured by an international and regional panel. Physical delivery is targeted at approximately 60 days, with an indicative Dubai timeline of approximately 40 days, subject to production, verification, export and logistics requirements. With a defined allocation, fixed pricing, digital traceability and a structured physical delivery process, Kamitente Gold brings together established gold production and modern digital infrastructure in a more accessible format.
The Future of Real World Investments
Dr. Khaled Sadek

CEO

The Future of Real World Investments
Dr. Amre El-Lakany

COO

The Future of Real World Investments
Roberto A. Lacayo

Head of A&M Americas, the Caribbean, and the DemocraticRepublic of Congo,Board Member

The Future of Real World Investments
Antonio Barbalho

Senior Financial Adviser,Board Member

The Future of Real World Investments
Philemon-Sauveur Kuyitila

General Manager

Insights

loading